The LIMS test equipment detail view contains the tabs: Notes, Control batches, Equipment bookings and 8D reports

Under Add new task, you can create all tasks that directly affect this test equipment and can be linked to a specific date. This is also ideal for recurring tasks such as checks, maintenance work, calibrations, adjustments, etc.
See instructions: Create task
Under Notes you can see a chronological list of everything that has happened with this test equipment. You can use new notes to document what has happened to the test equipment. A date and files can also be stored for each note. For example, you can document a test equipment repair in a note and store the repair confirmation as a PDF.
Under Control charts, you can create control charts in which quantitative control measurements are continuously entered. For example, the temperature of a refrigerator is continuously measured and entered in a control chart with defined upper and lower limits. If the limits are exceeded, the test equipment is blocked.
See instructions: Create control charts
Equipment bookings allow you to book test equipment for a defined period. This allows you to see when which test equipment is booked for use. Upcoming tasks and entered bookings are displayed in the calendar.
8D reports allow the documentation of problems or defects with a test device. Each 8D report contains a team responsible for the solution, a description of the problem and the planned measures.
See instructions: Create 8D Report: Generate Quality Deviation Reports
Laatste wijziging: 21.08.2026
Algemeen
Leveranciersbeoordeling
Materiaal
Medewerkers
Klanten
Opdrachten
Monsters
PDF-sjablonen
Bijlagen
Recepten
Verslagen
Editor voor rapporttabellen
Interfaces
Kompetenzen
AI-functies
Inleidende fase
Analyses
Sjablonen
Klantenportaal (optioneel)
Aanbiedingen
Facturen
Parameters
Rekenwerk met parameters
Webservices
Transformatiecode
Controleplannen / Grenswaarden / Specificaties
Documentbeheer
Vragen en antwoorden
Testmiddelen
Opleidingen voor medewerkers
8D-rapport
Overige
Bestandsbeheer
Processen